Fabirika · Software for industry

Software for
things that
get made.

Fabirika builds software for industry. Not generic tools adapted to fit. Products designed from the floor up, for the specific way your operation runs.

→ SIGHTLINE STA. 0+00 z z Before anything is built, someone has to measure. 1 000 m · SCALE 1:500

ACT II · 02 / 06
Act II

Every industry. Studied from the inside.

FBK-04 CONCRETE FRAGILE THIS UP ↑ PACKAGING EDIBLE OIL BOTTLING CLOTHING LOGISTICS AND MANY MORE The workbench. SHEET 02 · EXHIBIT A
Concrete. Packaging. Edible oil. Bottling. Clothing. Logistics. We spend time on the floor (watching how the work moves) before we write a single line. Each product is designed for one vertical and one vertical only.
Industries served
Concrete · Packaging · Edible oil
Bottling · Clothing · Logistics

Products built
Scheduler · Estimator · Dispatch
Inventory · QC

ACT III · 03 / 06
Act III

End to end. One stack.

SILO-01 67% · FEED RATE 2.4 t/min SILO-02 CONVEYOR · 2.4 t/min → MIXER · C25 · Ø 3.8m DISPATCH CONTROL OVERALL LENGTH · 42.0 m CEMENT A concrete batching line, drawn end to end. SHEET 03 · FBK-BP-12 · SCALE 1:200 N
Scheduler, dispatch, inventory, QC, estimator. Built separately so each stays sharp. Connected so nothing falls through a gap. No integration tax. No middleware.
Modules
Scheduler · Estimator · Dispatch
Inventory · QC

Integration model
Single platform · shared data layer

ACT IV · 04 / 06
Act IV

The software fits the steel.

fabirika.com/scheduler fabirika SCHEDULE ROSTER TIMESHEETS DISPATCH REPORTS This week WK 17 · APR 20-26 MIXER 01 MIXER 02 DISPATCH QC LAB LOADING CLEAN-UP MON TUE WED THU FRI SAT SUN A · PRATIK B · AMINA A · PRATIK C · JOHN B · AMINA DRIVERS · POOL DRIVERS · POOL QC · SARA TODAY · 08:42 Mixer 01 pours C25 at 10:00. Driver Amina, 6m³ to site Westlands · Load 2 of 4. THIS SHIFT → DRIVES THIS LINE LIVE CONNECTIONS → MIXER 01 · OK → MIXER 02 · OK → CONVEYOR · WARN → FLEET · 8 TRUCKS
We draw the site before we write the first line. Mixer positions, truck bays, shift patterns: the system models your operation, not a generic one. Bespoke, not configured.
Approach
Site-mapped · purpose-built

Typical delivery
Under 14 days to live

ACT V · 05 / 06
Act V

Offline first. Site ready.

← MIXER 01 · SHEET 03 Production 1 CONCRETE BATCHING SITE BOUNDARY Warehouse A RAW MATERIALS Production 2 EDIBLE OIL · TANKS QC Lab Maintenance Dispatch Yard The whole site, from above. SHEET 05 · FBK-SITE-01 · SCALE 1:2000 N ROAD / MATERIAL FLOW BUILDING BOUNDARY
Phones in dusty pockets. Tablets under direct sun. No WiFi at the batching plant. Fabirika works everywhere your crew does. Syncs when signal returns.
How it works
Installs from the browser · no app store
Works without signal · syncs on reconnect

Runs on
Any phone · tablet · desktop

ACT VI · 06 / 06
DRAWN BY APPROVED BY DATE

Schedule a consultation.

Tell us what you make. We'll tell you which modules to turn on, how long setup takes, and what it costs. No demos, no decks. Just a conversation.